Penerapan Metode Life-Cycle Cost dalam Perhitungan Evaluasi Ekonomi Jembatan untuk Penentuan Prioritas Penanganan Jembatan

Risang Aji Dananjoyo, Risang Aji Dananjoyo and Akhmad Aminullah, Akhmad Aminullah and Arief Setiawan Budi Nugroho, Arief Setiawan Budi Nugroho (2020) Penerapan Metode Life-Cycle Cost dalam Perhitungan Evaluasi Ekonomi Jembatan untuk Penentuan Prioritas Penanganan Jembatan. Jurnal Ilmiah Sains dan Teknologi, 9 (2). pp. 91-180. ISSN e-ISSN 2443-1311

[thumbnail of Penerapan Metode Life-CycleCost dalam Perhitungan Evaluasi Ekonomi Jembatan untuk Penetuan Prioritas Penanganan Jembatan.pdf] Text
Penerapan Metode Life-CycleCost dalam Perhitungan Evaluasi Ekonomi Jembatan untuk Penetuan Prioritas Penanganan Jembatan.pdf - Other

Download (430kB)

Abstract

Bridge oftentimes become a critical components of roads because it used to determine the maximum load capacity of a passing vehicle on the roads. The bridges require maintenance activity in the shape of general maintenance or periodically replacement while this is estimated in order that the bridge may continue to function properly. The economic evaluation of the Interurban Bridge Management System (IBMS) aims to determine the priority of bridge handling. One of the calculations required in NPV and IRR calculations used in priority handling is the cost of replacing the bridge. Over time, the Interurban Bridge Management System (IBMS) system must be constantly updated to continue to use in accordance with current circumstances and use new, better methods. This study uses Life-Cycle Cost (LCC) method as an alternative method to calculate the replacement cost of 5 bridges in Daerah Istimewa Yogyakarta in 2012. The IBMS method produces a priority sequence of bridge handling with Bogo bridge, Suru bridge, Winongo bridge, Kalasan B bridge and Duren bridge in sequence. The Life-Cycke Cost (LCC) method produces a priority sequence of bridge handling with Bogo bridge, Winongo bridge, Suru bridge, Kalasan B bridge and Duren bridge. The average initial cost of bridge replacement using both methods is 23.012%. The value earned using the Life-Cycle Cost method is always greater due to the addition of inspection fees, maintenance costs, and damage costs of the bridge.

Item Type: Article
Uncontrolled Keywords: Life-Cycle Cost; IBMS; Bridge; Priority of Bridge Handling
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Electronics and Computer Science
Depositing User: Mrs Ni Made Yunia Dwi Savitri
Date Deposited: 17 Nov 2022 01:34
Last Modified: 17 Nov 2022 01:34
URI: http://eprints.triatmamulya.ac.id/id/eprint/1823

Actions (login required)

View Item View Item